Customer Case Studies

Build trust with real-world case studies that demonstrate our expertise and service quality.

Wind and Hydro Power

5MW Wind Turbine Tower Bolt Pre-tightening Project for a Major Wind Power Group

Leading domestic wind power equipment manufacturer

Challenge:Tower flange M64 large-diameter bolt pre-tightening; torque requirement 35000Nm, tolerance ±3%, confined working space at height.

Results:Single turbine fastening time reduced from 8 to 3 hours; torque accuracy met all requirements, earning high customer satisfaction.

View details
Oil & Gas

Pipeline Flange Bolt Torquing Project at Petrochemical Base

Large-scale petrochemical enterprise

Challenge:DN800 Pipe Flange M48 Bolt Pre-tensioning, Explosion-proof Requirements, Pressure Rating PN160, Zero Leakage Standard

Results:Passed pressure testing on the first attempt with zero leaks, earning recognition for safe production.

View details
Shipbuilding and Marine Equipment

Ship Engine Assembly Project at a Shipyard

Leading Shipbuilding Manufacturer

Challenge:Pre-torquing main engine cylinder head bolts: torque range 2000-8000 Nm. Limited cabin space and high corrosion protection requirements.

Results:40% increase in assembly efficiency, 3x longer tool lifespan

View details
Steel Metallurgy

Steel Rolling Equipment Maintenance Project at a Steel Mill

Large-scale steel group

Challenge:Rolling mill housing bolt pre-tightening, torque value 15000Nm, high-temperature dust environment, downtime limited to 4 hours.

Results:Complete all fastening in 3.5 hours to resume production early and reduce downtime losses.

View details
nuclear and thermal power

Conventional Island Bolt Pre-tightening Project at a Nuclear Power Plant

Nuclear Power Operations Company

Challenge:Turbine casing bolt pre-tightening for nuclear safety class: torque accuracy ±2%, with traceable data.

Results:Passed nuclear safety acceptance; established a complete torque data archive

View details
Construction Engineering

Steel Bolt Tightening Project for a Cross-River Bridge

Large-scale construction enterprise

Challenge:Main bridge steel box girder M36 high-strength bolt pre-tensioning; working at height with high torque coefficient variability.

Results:100% accepted; digital construction records established

View details