Oil & Gas Industry Solutions

Industry Pain Points
- ●Flammable and explosive environments require explosion-proof certified tools.
- ●Bolt preload requirements for large-diameter flanges (DN200-DN1000)
- ●High-pressure sealing requires uniform torque.
- ●Continuous production requires minimizing downtime.
- ●Corrosive media; tools require anti-corrosion treatment.
Recommended Product Bundles
Explosion-proof pneumatic hydraulic wrench
Ex-rated explosion-proof certification; pneumatic actuation eliminates spark risk
High-Torque Hydraulic Pump
High-pressure, high-flow performance supporting simultaneous multi-tool operation
Flange Fastening System
Synchronized tightening ensures uniform stress distribution on the sealing surface.
Corrosion Protection Tool Kit
Special coating treatment for chemical corrosion resistance
Typical Use Cases
Refinery pipeline flange bolt pre-tightening
Flange Bolt Tightening for Chemical Reactors
LNG Tank Bolt Installation
Ethylene Unit Heat Exchanger Maintenance
Maintenance of Oil Pipeline Valves
Need a customized solution?
Our engineering team will provide a specialized bolt preloading solution tailored to your specific operating conditions.
